Specialists in all aspects of drainage, sewers, water, and environmental surveys



Email drainageservices@btinternet.com

Andy Young © 2020. Young Technical Services, Stafford.

Drainage and Construction Services 
Drainage management Case Study.pdf Culverted Watercourse Investigation.pdf Gully survey Case Study.pdf Highway flooding Case Study 2.pdf

CASE STUDIES

Our wide range of services includes:

Survey, investigation and mapping of drains and sewers

CCTV inspection and jetting

Management of industrial drainage systems

Entry into confined spaces

ISO 14001 surveys

Developer services, utility applications and management

Industrial water management

Flooding and impermeable area surveys

Pollution investigation

CAD and GIS expertise

Civil Engineering and drainage repairs hac habitasse platea dictumst.

Issue: growing problem of a rising water level at Sneyd Reservoir, increasing approximately 300mm per year. The original Victorian outfall system, which had been poorly modified in the 1960’s, had fallen into disrepair and was no longer usable. The water level had covered all of the fishing pegs and much of the footpaths. This made maintenance of the area almost impossible. The rising water would flood the adjacent road and School within two years. After a costing exercise and liaison with all stakeholders a new route for the outfall was approved.  The main consideration was how to initially reduce the water level in a controlled and safe way, all 25 million litres. We decided the best plan was to bring the water to the outfall rather than take the outfall to the water! The job was completed two weeks early, on budget, and met the client’s and Environment Agency’s expectations with regard to the water level and the ability to manage that level. The anglers are back and revenue from this is expected to rise considerably over the next few years. The Council can now effectively manage this wonderful Victorian resource.   For full case study click here (pdf).

More case studies

A selection of case studies are provided below. Please click on the link to read about each project in more detail (pdf).

Sneyd Reservoir Case Study 2 page.pdf

Sneyd Reservoir Scheme Purpose: to reduce the water level by 1.2m or 25 million litres!


Highway Flooding, Bridgeman Street, Walsall

Culverted Watercourse Investigation

Drainage Survey and Investigation for ISO 14001 Accreditation

Speciality Services, Manhole Cover Marking

Highway Drainage and Gully Survey, Walsall Town Centre

Industrial and Commercial Drainage Management